Review:
All the information you need and more to get started with rearing a scalable BSF farm. It breaks every step down into digestible pieces, including equipment and record keeping templates and examples. The cherry on top is being provided with all this for 3 scenarios depending on your work schedule i.e. 1 – Everyday full capacity, 2 – Everyday half capacity and 3 – Monday, Wednesday, Friday. The number of workers required, waste capacity in tons per week to output of 5-DOL.
#ads
Link to the free ebook – Black Soldier Fly Biowaste Processing – Eawag
Related:
Table of contents:
GLOSSARY IV
Chapter 1: RATIONALE
1.1 General Introduction
1.2 Scope and target audience
1.3 Navigating through this guide
Chapter 2: WASTE TREATMENT BY BSF
2.1 Understanding the natural BSF life cycle
2.2 Overall siting consideration for a BSF processing facility
2.3 Engineering the BSF life cycle
Chapter 3: ACTIVITIES IN A BSF PROCESSING FACILITY 22
3.1 Activities in the BSF rearing unit
3.2 Activities in the waste receiving and pre-processing unit
3.3 Activities in the BSF waste treatment unit
3.4 Activities in the product harvesting unit
3.5 Activities in the post-treatment unit (larvae refining and residue processing)
Chapter 4: HANDLING SCHEDULES IN A BSF-PROCESSING FACILITY
Chapter 5: BLUE PRINTS OF EQUIPMENT
Chapter 6: MATERIAL REQUIRED IN A BSF PROCESSING FACILITY 84
6.1 Material for the BSF rearing unit
6.2 Material for the BSF waste processing unit